Monday, November 5, 2007

Pre-Walkthrough

I met with our Builder Monday afternoon for the Pre-Walkthrough. He said that he knew I would find some punch list items at the official "orientation" next week, but his goal was to have the number of punch list items to be very low.

We walked the house and discussed several items, from caulking yet to be done, adjustments with cabinets, missing light bulbs, to drywall and paint touchup. Cliff made half a dozen calls to the trades while we were doing the review to get them out in the next day or so to finish up.

RCS Construction was hanging the pegboard in the garage. They are supposed to do the powerwash on Tuesday.

Ro-Mac had been out and installed the screens on the windows and weatherstripping on the front doors. Cliff found some problems with the weather strip and will have them correct it.

We discussed the exterior concrete flatwork on the drive and walks. I'm not happy with the appearance of the surface. The shape and grade are ok, but it just looks very bad in terms of finish. Cliff thinks it will bleach out, but I'm not sure. We'll see how it looks after powerwashing is done.