Today the masons were doing some final tuneup work before the cement is poured around the steel rebar embedded into the concrete block. Yesterday they walked the site with the inspector and noted where they had missed installing rebar. Today they are drilling into the slab to anchor the missing rebar and then connecting it to the steel that goes up through the block. Then a final inspection is due.

The missing window sills are indeed installed. There is also a very interesting saw cut at the top of the front door space. I think it is wrong, but we'll have to wait and see.