Tuesday, July 24, 2007

Plumbing - Errors Corrected

Today the plumbing crew broke out the slab at the lines for the Master Shower and moved them to the correct location. They also chipped out concrete and moved the ice maker connection back a few inches to the correct spot in the stud wall behind the refrigerator location.

Other plumbing rough-in was done, including installation of one plumbing stack vent. We've even got outside hose bibbs (sillcock,spigot,faucet -- depending on what area of the country you grew up in).

Also, it appears that the roof sheathing / truss inspection was completed. No other work was done. I'm waiting for the electricians to get to work.

One problem surfaced. It appears that the dumpster emptying truck was not very considerate of my neighbor's property, as they drove across his grass and broke a section of his sidewalk next to our property line. I'm seriously thinking of putting up my own silt fence to better delineate the line.

On the overall subdivision front, there was good progress today. The front gates are being installed and they are really nice looking, simulated wrought iron gates. Also landscaping was put in on the bridge abutments today.