Friday, June 15, 2007

Density Check

Today an inspector did a dirt density check at three locations within the forms for the foundation. The goal was 95% compaction minimum and the results were 99.9%. No other progress on Friday.
Posted by Cap & Judi at 10:43 PM
Labels: density check

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (118)
    • ►  December (1)
    • ►  November (10)
    • ►  October (24)
    • ►  September (21)
    • ►  August (21)
    • ►  July (24)
    • ▼  June (17)
      • Curing Time
      • We Have a Slab!
      • Final Slab Preparation
      • Private Inspector
      • Slab Preparation
      • More Inspections
      • Water Meter and Under Slab Plumbing
      • Builder Meeting
      • The plumbing drains are in!
      • Builder Meeting Scheduled
      • Sitting on the Lanai
      • Density Check
      • Public Notice
      • "Builder" Assignment
      • Our First Builder Pictures
      • Forms for the Slab
      • Construction - Stage 1 - The Slab

About Us

  • Cap & Judi
  • Cap