When I checked this afternoon, all the issues found by the inspector yesterday had been corrected and the City Inspector had passed the mono-slab inspection. My Builder called me to say that the slab pour had been scheduled for Thursday morning, at either 6:30 AM, if we are the first pour, or between 7:30 - 8:00 AM if we are second.
I also cleaned up some debris around the site and put it in one of the dumpsters. With three dumpsters sitting right at the front lot curb, I don't understand why the contractors just leave their debris on the ground. However, I realize that I will probably not be able to change that behavior, as it is just another job to them.