When I checked the site on Sunday, I found that two inspections had been done, and passed, sometime on Friday. The Sewer Inspection and the Plumbing Inspection #1 were both done. Also, since those were complete, the plumbing trenches had been filled in with dirt. The excavations for the slab footings was done, although the reinforcement rebar was not yet installed.

I cleaned up some trash from the site. While it might be minor, I don't like to have soda cans buried under the slab footers.

The water meter reading is holding steady, so it appears that there is no water leakage in the installed plumbing lines.