I stopped by to check the building site this evening. The trenches for the under slab plumbing have been dug out, and the drains are all in, with stubs going up for the sinks, tub / showers, and water closets. The crew had laid out string lines showing where key walls will be, so they could then run the drains to the correct (I hope) locations.
It was getting dark, so I didn't take pictures, but plan to do so on Thursday.