There was no work being done at the site today when I checked. However the under slab plumbing was completed and a pressure test was underway. The water meter was installed and connected. The sewer lines were connected to the public sewer.
I took twenty pictures of the under slab plumbing, uploaded them to my computer, and labeled each one with the room and direction. I hope I never again have a plumbing problem under the slab, but I will have pictures in case they are needed.
Cliff, our Builder, called and emailed me. He plans to have the slab poured next Wednesday if the inspections are ok. He ordered both the required City inspection and my private inspection for Tuesday.