skip to main | skip to sidebar

Building the House - The Construction Stage

This section describes our experience as our builder, Pringle Development, constructs our new home in Florida. It's a single story, concrete block on slab home. Follow along as we move from an empty lot to a finished home.

Friday, September 7, 2007

Inspection Day

There was no activity on Friday. My outside inspector was scheduled to do the pre-paint inspection, after the drywall was hung, taped, mudded, and texture was applied. I'll get the results on Monday.
Posted by Cap & Judi at 11:02 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (118)
    • ►  December (1)
    • ►  November (10)
    • ►  October (24)
    • ▼  September (21)
      • Dirt
      • No News
      • Cabinets - Some Miscommunication
      • Work Continues
      • Cabinets Arrive
      • Driveway Poured
      • Garage Doors
      • More Tile Work
      • Tile - But No Concrete
      • Landscape Meeting
      • More Paint - But No Inspection
      • Inteior Painting & Driveway Forms
      • Inspection Report
      • Paint Arrives
      • Inspection Day
      • Texture & Doors
      • Wednesday - A Day of Rest
      • Exterior Painting
      • Electrical Fixes & Finished Drywall
      • More Taping & Mudding
      • Drywall All Hung
    • ►  August (21)
    • ►  July (24)
    • ►  June (17)

About Us

  • Cap & Judi
  • Cap