Saturday, September 15, 2007
More Tile Work
On Saturday, by 12:30 PM, the tile crew had laid out lots of tile in the Great Room, Nook, Kitchen, and Hall. They also had put in the base for the "no step" walk-in shower in the Master Bath, with a continuous slope to the drain. The crew supervisor was very proud to show us his work. He told us that the tile work should be done by the end of the day on Tuesday. Great progress.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment