Today there was good progress. As of mid-day, the walls and ceilings had been textured. There was also some "free" texturing of the painted stucco on the lanai, some exterior windowsills, and a closet door. Another clean-up or do over.

There were two workers installing the interior doors and the door / baseboard trim. The bi-fold guest linen closet door that we were worried about opens with plenty of space to put things in / get things out of the closet. It is a few inches wider than the linen closet at our rental home, and that makes a tremendous difference. The doors are all 8' high, and the closet ceilings are 11' 4", so there is a tremendous amount of space. I supposed we can stack light things, like a case of TP, on the top shelf, in case deliveries are interrupted for a month or so during hurricane season. ;)

There are a few fit / finish issues, but I suspect it is too early in the process to worry about.

I did my weekly drive around Lakes of Mount Dora checking on construction today. I found several homes that had been completed and closed that were started in mid to late April. That effectively means that Pringle is bringing in homes in about four and 1/2 months from the time the slab is poured.

There is a complete new set of pictures available from the www.LakesofMountDora.org home page link.

No comments: