Tuesday, September 11, 2007

Inteior Painting & Driveway Forms

Tuesday was a busy day. The interior ceiling and wall paint was applied. The crew was working until about 7 PM to complete the job.

Also, the forms for the driveway, front sidewalk, rear cage, and A/C pad were installed. They will return on Wednesday to finish forming two more pads, one for a generator and one for a second door from the cage. The irrigation crew put a plastic irrigation pipe under the driveway for me so I can later install the wire for my Invisible Dog Fence, without having to cut the driveway slab, or bore under it.

The form inspection is due tomorrow and then the pour will likely be Thursday, weather cooperating.

No comments: