Several things happened today at the construction site.
The tailored foam was injected into the concrete blocks today. I need to check on a few locations to be sure the cells were filled, as this is, in my opinion, a very expensive option from Pringle.
The framers came back to "pad out" the area near the large door wall where the doors all stack to the side. It seems they only made it 4" deep at first, when it is supposed to be 4 1/2". It was also a bit narrow.
The plumbing crew finished connecting the master bath shower valves. They also partially filled the bath tub and left the water in it, supposedly to check to be sure the drain did not leak.
The toilet and island sink floor drains all got large rubber stoppers installed, supposedly to be sure that no construction debris got down them. I suspect this should have been done two weeks ago, but the inspection is coming up soon, so at least it is done.
The gas line for the furnace was moved to match up with the framing location for the furnace.
Also, someone from the truss company was inside inspecting the trusses.
In summary, there were three or four "do overs", one step forward on plumbing , and one step forward on foam insulation.