Pringle was nice enough to send new pictures to me while I'm up in Northern Michigan. From the pictures I see the following progress has been made this week:
The Pest Defense tubes have been installed in the walls.
The Radiant Barrier has been installed. The exterior insulation has been installed on the Garage to Home wall, the wood panel by the Great Room Doorwall, in the wood framed panels above the arched Front Door and Dining Room windows, above the Garage, and in various nooks and crannies where the blown insulation won't reach. Also, the extra sound deadening insulation has been installed at the Master Bath and Powder Room.
The tubs have been protected with covers.
The stucco crew has started work.
Some of the pre-drywall walk through items have been corrected. However, from the pictures, I can see that at least two have not been corrected yet. I sent an email to Cliff.