Monday, August 20, 2007
Stucco Pre-Work
I'm still in Michigan, so pictures will be delayed. However, I was told yesterday that the metal guides for the stucco edges and banding have been installed. Since the rough-in inspections have been passed, I'm hoping we can get on a parallel path, and do both inside and outside work at the same time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment