We had our pre-drywall walk-through today. Our Builder, Cliff, came in even though he had hurt his back, as he knew that I was going out of town tomorrow.
Because we had been checking the house construction frequently, the walk-through was a low key event. I had one cable connection that was needed to be moved, asked to have a fan box moved, and asked to have an outlet moved. Some of the tempered windows had been put in the wrong location. This is not a big deal, as the window frames are correct, just the glass panels need to be relocated to the correct location to meet code.
I asked about a couple of electrical items in the kitchen that need to be checked for code compliance. Cliff will check to be sure that the tailored foam was installed in the block above the windows. We discussed a few studs that seemed to be bowed, and he will have them fixed.
We also reviewed some other open items on my punch list, which he agreed were open. Overall, no big issues.
The guest bath tub was "on the truck" but had not arrived when we were there. It is supposed to be installed tomorrow.
Tuesday, August 14, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment