The wrong shelving in the Master Closet was pulled out today.
The drywall "mudding" crew was in doing touchup. The electricians finished except for the kitchen island.
The "green" yard treatment (poison?) was applied today. They spilled some of it on the concrete drive and front walk. We'll see if it will wash off when Pringle power washes before closing.
We met with a fourth blind company, liked their information and pricing, and ordered all our blinds. They were impressed with the straightness of our window openings, as there was very little variance in width from top to bottom. They also suggested that we have the baseboard trimmed back at the edges of the doorwall, so verticals could hang evenly and not be pushed to the side by the 1/2" baseboard.
We also met with a concrete treatment company to get an estimate to have the garage floor coated with a decorative epoxy before we start using the garage.
The replacement kitchen and vanity cabinets have not arrived.
Tuesday, October 9, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment