Today the garage doors and trim around them were painted. The painter had also masked the front door and was preparing to paint it, if it didn't rain.
The water was shut off at the meter and a sign posted - "do not turn on - open water valves". While I didn't look, I assume the kitchen island is not yet replumbed at the correct location.
Two small pieces of tile were installed in the Master Bathroom, but other requested tile work about a foot away was not done.
No other new work was obvious.
Monday, October 29, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment