The remainder of the sod was laid today. The landscaping from Pringle is complete except for some paving stones and the initial adjustments to the sprinkler system. Some extra sod was laid where my planting beds butt up against the vacant lot next door. This was to keep my mulch from escaping. Nice.
We had a bit of problem with the sprinkler system. One of the two main valves still did not have the electrical wires connected on Friday mid-afternoon. I asked my builder to get it fixed so there would be irrigation for the newly installed plants and lawn. He called me around 4:00 PM and advised that the irrigation company was there and fixing it.
The garage "attic storage" steps are in a box in the garage, to be installed next week.
The missing latches for the nook slider were installed.
A painter was caulking, but stopped at 3:30 PM. He said he would return on Monday.
The remaining kitchen cabinets are due on Tuesday. My builder plans to have carpet installed by the end of the week. Then it is on to the development of the punch list.
24 Days and counting down.