Our remaining trees were delivered today, and all but two of the palms were installed.
There was a "oops!" digging the hole for one of the palms. They hit the main power feed to the house. It's a good thing they were using shovels with fiberglass handles, as the workman was not injured. The shovel blade has a new configuration now. Here is a picture. The electrical feed is on the left, below the sprinkler pipes.
It's amazing how shallow the power wires are buried. They appear to be off center from the markings, and were buried with no caution tape above them.
The sod was delivered and installed. It appears to have been grown on good, dark, topsoil (or muck).
Our pine bark nugget mulch was also installed.
The landscaping is almost done, except for planting the two palm trees in the front yard and one landscape bird of paradise plant which should be delivered tomorrow. Then we're into the sprinkler head adjustment.
There was work done on the kitchen island countertop today. There is a clearance issue with the sink faucet holes which needs to be resolved.
Tomorrow the HVAC is supposed to be programmed / put into operation.